Interlock Definition

An interlock is a mechanical or electrical arrangement intended to prevent an undesired operating sequence in electrical equipment. In switchgear, it connects an allowed action to a required condition: a door may…

U.S.Manufacturing focus
NewCustom project-led builds
NationwideProject support
Made in the USA
Short lead times, confirmed per project
UL 891 subject to project scope
Nationwide delivery planning

Interlock Definition in Switchgear

An interlock is a mechanical or electrical arrangement intended to prevent an undesired operating sequence in electrical equipment. In switchgear, it connects an allowed action to a required condition: a door may need to be closed, a breaker may need to be open, or a grounding device may need to be in a defined position before another operation is possible. The purpose is sequencing, not general control of every system function. A project team should describe the exact hazardous or conflicting sequence, identify the equipment states that matter, and decide whether the interlock must be mechanical, electrical, or a coordinated combination. That definition belongs in the equipment design and operating documentation.

Mechanical and Electrical Interlocks

A mechanical interlock uses physical parts such as shafts, levers, locks, barriers, trapped keys, or position mechanisms to constrain movement. An electrical interlock uses contacts, relays, auxiliary switches, permissive circuits, or control logic to withhold an electrical command until conditions are satisfied. Mechanical arrangements can remain effective without control power, while electrical arrangements can communicate conditions over a control circuit and support remote operation. Neither category is automatically preferable. Engineers should consider fault conditions, maintenance procedures, loss of control voltage, manual operation, remote commands, and the possibility that a device indication could differ from its actual position. The selected arrangement should match the sequence being controlled and the project safety review.

Common Switchgear Interlock Sequences

Typical examples include preventing a drawout circuit breaker from moving between positions while its contacts are closed, preventing access to a compartment until a related conductor is isolated, or preventing two sources from closing together when the distribution design permits only one source at a time. A main-tie-main lineup may require a defined open-transition sequence, but the acceptable positions depend on the one-line diagram, source arrangement, protection scheme, and operating procedure. A grounding switch can also be tied to source isolation and access conditions. These examples are illustrations rather than universal requirements; each new custom switchgear build needs a project-specific sequence, device list, and responsibility matrix showing which condition permits or blocks each action.

How to Specify an Interlock

A useful interlock specification starts with an operating sequence written in plain language and then converts each step into verifiable states. Identify every source, breaker, switch, tie, compartment, door, key, control-power source, remote command, and position indication involved. State whether an action must be blocked, alarmed, or merely indicated, and explain what should happen after a control-power interruption or a device trip. Include permissive and blocking logic, contact requirements, key-transfer rules, labels, wiring diagrams, and a method for functional verification. The manufacturer can then coordinate the custom enclosure, bus arrangement, protective devices, control wiring, and documentation with the engineer and installer instead of inferring intent from a drawing symbol alone.

Interlock Review, Testing, and Documentation

Interlock review should occur before fabrication, when the single-line diagram, control schematic, layout, and operating narrative are compared for consistent device names and states. During inspection or a project-defined factory acceptance test, each required sequence can be exercised with agreed acceptance criteria and recorded results. Verification should cover normal operation, prohibited commands, local and remote controls, position transitions, loss and restoration of control power, and any key-exchange procedure that the design uses. Test records do not replace field commissioning or the facility operating procedure. They provide traceable evidence that the specified logic was checked, while the project team remains responsible for confirming installation conditions and final operating practices.

Interlocks in New Custom Switchgear

When a customer buys new switchgear directly from an American manufacturer, an interlock discussion should be part of the initial quote package rather than an afterthought. Switchgear Builders manufactures new electrical switchgear custom to specification, using American components and supplying equipment for nationwide shipping; the exact interlock arrangement still depends on the project documents and engineering review. Provide the one-line diagram, sequence of operations, equipment schedule, control voltage, source relationships, access requirements, and desired documentation. Ask which interlocks are mechanical, which are electrical, how remote operation is handled, and how the acceptance checks will be witnessed. That information helps define scope without assuming a particular lineup, rating, certification, or standard applicability.

GOOD TO KNOW

Questions & answers.

Practical answers to help you plan the next step.

What is an interlock in electrical switchgear?

It is a mechanical or electrical arrangement that permits or prevents an operation based on defined equipment conditions and sequence requirements.

What is the difference between a mechanical and electrical interlock?

A mechanical interlock constrains movement with physical parts, while an electrical interlock uses contacts or control logic to block or permit commands.

Does every switchgear lineup use the same interlock arrangement?

No. Interlocks depend on the one-line diagram, source relationships, device positions, access rules, operating sequence, and project engineering decisions.

What information should accompany an interlock request?

Provide the one-line diagram, sequence of operations, device list, control voltage, remote-control needs, access conditions, and required test documentation.

LET’S BUILD SOMETHING THAT WORKS

Tell us about your project.

Share the essentials and start a conversation about new switchgear requirements, specifications and schedule.

Call (951) 403-5738

This form opens your configured email app to prepare a message. Send it from your email app, or contact saleselectricalbuyers@gmail.com directly.

All fields are required. Your email app is needed to send this request.

Request a quote